U11: Plug Arrangements for Alleviating Peak Loads
Status
UBD Ref No: U11 Status: Granted
Inventors: Tanuja Hrishikesh Ganu, Shivkumar Kalyanaraman, Devasenapathi Periagraharam Seetharamakrishnan, Liyanage Chandratilak De Silva
Documents: U11 G US, BN/2012/0009, US 13/445645, US 2013/0274945, US 9,748,771
United States
- Filed: Apr 12, 2012
- Granted: Aug 29, 2017

Summary
The invention is to load-shift time-deferrable devices by placing an electrical load scheduling mechanism in communication with an appliance. Delivery of electrical power to the appliance is scheduled via the electrical load scheduling mechanism based on assessed electrical grid load conditions. The scheduling includes altering a predetermined delivery of electric power to the appliance based on the assessed electrical grid conditions